How to cover the roof with your own hands with your own hands

Are you considering doing the roof covering yourself? It could be a fulfilling project that helps you feel accomplished and saves money. It takes careful planning and attention to detail to do roof repairs yourself, whether you’re starting from scratch or repairing an old roof.

Evaluating your roof’s condition is the first step. Check for any areas that require repair, leaks, or damage. Resolving any problems is essential before installing a new roof. This guarantees a strong base and averts issues later on.

Next, decide which roofing materials are best for you. Traditional asphalt shingles, metal, wood shakes, and even environmentally friendly options like solar tiles are available as options. When making your choice, take durability, affordability, and aesthetic appeal into account.

Before you begin, gather the required tools and supplies. It may be necessary to have hammers, nails, roofing felt, adhesive, and safety equipment like gloves and goggles, depending on the kind of roof and materials you’ve selected. Everything needed to complete the process will be readily available.

A clean, dry, and debris-free roof deck is essential before you start installing your roofing material. This prolongs the life of your new roof and offers a smooth surface for installation. If required, take off old shingles and look for any repairs needed on the underlying structure.

Make sure you carefully follow the manufacturer’s instructions when installing the roofing material. There are particular installation methods for every kind of roofing material to guarantee adequate weatherproofing and sealing. Work methodically and slowly from one side of the roof to the other.

Lastly, keep safety in mind at all times when working on the project. Use safety measures like harnesses and sturdy ladders when working on roofs as they can be dangerous. Don’t be afraid to seek advice or assistance from a professional roofer if the project seems too big for you.

In addition to saving money, doing the roof covering yourself gives you satisfaction from a job well done and useful skills. You can have a roof that both protects and improves the appearance of your house with proper planning, the right materials, and close attention to detail.

How to cover the roof with slate: features of laying

If you are prepared with the right tools and fasteners and are acquainted with the working technology, installing slate on a roof is not too difficult.

The main characteristics of the slate

The classic asbestos-cement slate is still very popular, even with the introduction of new roofing materials. This makes sense given the material’s cost and your ability to install roofing using your hands alone without the need for specialized tools. Classic slate can be used to cover a hip four-sized roof or a tent. It is appropriate for simple single-sloping and gable roofs.

The slate is easily processed and has a high level of resistance to aggressive media and static loads. The material is fairly heavy, so if you’re installing it by yourself, you’ll need to get one or two helpers to lift the slate sheets onto the roof without breaking them. This is one of the material’s drawbacks.

When attempting to cover a roof with slate, it is important to keep in mind that this material works best when applied to roofs with straightforward geometries. In order to minimize the chance of snow accumulation during the winter, it is ideal for the roof to have a slope of up to 20 ° or more than 35 °.

The method for applying coating to a pitched roof requires installing slate sheets that meet GOST 30340-95 specifications. Slate is one possibility:

  • six -wave (sheet thickness 5/6/7 mm, width 1125 mm);
  • seven -wave (sheet thickness 5 – 8 mm, width 980 mm);
  • eight -wave (sheet thickness 5 – 8 mm, width 1130 mm).

Any kind of slate sheet has a length of 1750 millimeters.

The labeling on slate should be carefully examined as it provides information on the wave’s height and pitch. These guidelines should be taken into consideration when determining where the material sheets should be placed on the roof. The material area moves closer to the vertical overlap the wider the wave step. The size and shape of the roof slopes determine which slate to use and how to lay it.

When deciding how to install slate roofing, the drainage system must be considered. In case the precipitation collection groove is positioned beneath the roof overhang, it suffices to install the outermost row with a 200-250 mm overhang in relation to the building’s wall. Should the roof’s water flow directly to the earth, there should be a minimum 400 mm overhang.

Slate rafter system

Make sure the rafter system is adequate for laying the slate before beginning the manual roofing installation. Since this material is heavy, the roof frame should be built to support heavy loads, such as the following:

  • the total weight of the roof pie;
  • atmospheric loads;
  • the weight of people who mount, serve or repairs the roof.

The roof frame should be especially careful if the slate is supposed to be used in order to block the old soft roof. If the roof is intended for metal tiles, ondulin, or other light materials, it might be necessary to reduce the step of the installation of rafter legs or the use of sockets to increase the stiffness of wooden farms.

The crate is composed of bars measuring 60 × 60 mm or an unspeakable board that is 15–25 mm thick. The minimum section of the rafters for the slate roof is 50 × 180 mm. The crate’s distance from the board should be between 200 and 1000 mm. Remember that each sheet needs to have a support for at least three horizontal jumpers when using a crate made of bars. A 60 × 120 m beam or a 60 × 150 mm board is mounted in the skate section.

The crate needs to be constructed from dry, undisturbed lumber in order to lay slate correctly.

Before installing the roofing, you must complete a special crate for structures if the roof is intended to mount an exhaust pipe or chimney. It is best to arrange the drainage system before installing the roofing. To avoid the lower edge of the roof collapsing under load, the metal strip on the lower row of the crate must be filled with a width of approximately 300 mm and a thickness of 2-3 mm. The metal strip has holes for the roof fasteners and needs to be waterproof on both sides.

How to cover the roof with slate?

If you’re installing slate coating by hand for the first time, you should be aware that this material can only be fixed in up to two layers at a time. As a result, careful consideration should go into the styling scheme during the roof design phase.

Sheets must be mounted in one or two waves with a horizontal overlap. If you need to cover a fairly steep slope with a small snow load, a one wave overlap is typically utilized. Gentle slopes require the overlap of two waves; this design is much more reliable, but the overall cost of the coating increases with such an installation, particularly when the wave has a large step. There should be a vertical obstruction of at least 200 mm on the upper sheet.

Installation of the styling technology must begin at one of the slope’s lower slopes and proceed along the cornice overhang. The overlap should be on the leeward side of the slate, which should be positioned with consideration for the wind rose. To ensure a smooth and even overhang, it is advised to place the first row of sheets on a rope that has already been stretched. Different styling options are used so as not to combine more than two layers of slate at one point. The most common methods involve installing a scope both with and without displacement.

Because of its simplicity, "Razing" installation is well-liked. In this instance, a new series is laid with a comparatively smaller displacement. This prevents wave overlaps from happening at the same time and ensures that only two slate sheets are ever joined. In order to install with a displacement, you must cut the extreme sheets and endure the upper edge of the final row due to the roof’s slope.

Installing the eight-wave slate is best done with a frame laid; all that is needed is a four-wave shift and the use of half-cut sheets to begin each odd row. In this styling version, the displacement lines are arranged in an aesthetically pleasing checkerboard pattern.

You can save roofing material if you lay slate without displacement, but this is a more time-consuming option that you should consider before beginning the installation by hand. In this instance, cutting the corners to the wave’s width and height of 120–140 mm is necessary. The lower corner of each upper row sheet is cut from the side covering the previous horizontal row slate sheet in order to arrange the coating elements from left to right.

The selection of fasteners and installation technique have a direct bearing on the question of how to cover the roof with slate. An expanded hat distinguishes slate nails, screws, and screws, which are fitted with a unique rubber gasket that permits the mounting site to be extremely tight. It is not appropriate to drive or screw fasteners up to the stop.

It is advised to mark and drill fastener holes in slate sheets beforehand to prevent damage to them during installation. The diameter of the holes should be two to three millimeters bigger than that of a self-tapping screw or nail.

Schifer mounting is only done on the wave’s crest when it comes to the roof. With an indent from the edge measuring 120–150 mm, the first mounting point is situated in the lower portion of the second (overlapped) wave. The mount at the top of the second wave is completed after the overlapping slate roof sheet is laid, with the second fastening point situated diagonally from the first.

You should install special skate elements made of asbest cement, arrange all the adjacents and joints, and provide dependable waterproofing after applying the coating by hand.

Safety regulations and maintaining the slate’s integrity

Safety technology should be used as well as installation technology when working on the roof. Ropes and safety cables must be used. The fence needs to be guaranteed if the structure is taller than six meters. It is advised to use a block system and a nylon cable to carefully raise the slate sheet. Assistants can serve the material if you need to cover a low-lying building.

Proceed with caution when walking on the installed coating. When slate roofs need to be repaired or maintained, wooden ramps must be installed to evenly distribute the weight.

When working with asbestos-cement material, observing safety precautions necessitates wearing protective gear. For example, when drilling and cutting slate sheets, wear a respirator correctly to shield your respiratory system from dangerous dust.

The correct way to lay and install slate on a roof, as well as the characteristics of the rafter system and slate covering crate.

Roof roof with slate for a private house with your own hands

You wonder how to properly cover and block the entire roof with slates. If you are first familiar with all the work’s technology and have the required tools and fasteners ready, installing slate on the roof shouldn’t be too difficult. This article will go into great detail about the benefits of laying the slate by hand.

Speaker characteristics

Although there are a lot of new roofing materials available on the market today, the traditional asbestos-cement slate continues to be very popular. This is explained by the material’s reasonable price and the fact that you can install a roof on your own without the need for specialized construction equipment. Traditional slate works well for straightforward single-sloped roofs; it can also be used to cover a hip or tent roof.

  • The slate has high resistance to static loads, resistance to the effects of aggressive external environments, mild workability.
  • We attribute a sufficiently large mass of material to the disadvantages – by performing the installation with your own hands, you need to attract several assistants to raise sheets of slate on the roof without a certain risk of damage.

After giving careful thought to the issue of how to cover a roof with slate, we have concluded that this type of material works best when installed on roofs with straightforward geometry.

The GOST 30340-95 requires that slate be installed on the roof correctly in order for the coating to be installed. There are various types of slates available:

When selecting a slate type, you must be aware of its markings, including where the step and height will be indicated. These specifications should be taken into consideration when creating the final layout for the sheets of this material on the roof. A sizable portion of the building material for a vertical overlap will disappear with a large wave step. Selecting the installation technique is worthwhile, keeping in mind the size and arrangement of every roof slope.

When deciding how to install slate roofing, the drainage system must be considered. You must lay the extreme row with an overhang of 250 mm from the building’s wall when the gutter is positioned to collect precipitation beneath the roof overhang. Water flowing from the roof down to the ground requires at least 400 mm of overhang.

Rafter systems for slate

You must confirm that the rafter type system is appropriate for laying slate before proceeding with the DIY roofing installation. Such materials fall into the category of heavy ones, and the frame roof’s design is based on high loads, like the following:

  • the total mass of the roofing cake;
  • atmospheric external loads;
  • the weight of people who install and serve the roof.

To improve the dependability of wooden farms, you might need to cut down on the number of steps involved in installing rafter legs or use sockets when roofing with metal tiles or other light materials.

The minimum rafter section for a slate roof is 50–180 mm, and the crate is installed from 60–60 mm bars.

The crate has a 1000 mm step.

It is important to remember that each slate sheet needs to have a specific support for at least three jumpers when using a crate made of bars.

The 60-by-120-meter bay is situated in the skating area.

To ensure more accurate slate installation, the crate is constructed from dry, special lumber that has not warped.

Prior to applying the last roofing coating, you must perform a special crate if there is a chimney or exhaust pipe installed on the roof. The drainage system’s device is installed prior to roofing installation. To keep the lower edge of the roof from collapsing under external loads, the metal strip on the very bottom row of the crate must be filled. The metal strip needs to be hole-punched for the roof fasteners and waterproof on both sides.

Putting slate on the roof

Installing sheets in one or two waves on a horizontal plane requires a specific overlap. A reasonably steep slope with a small external load from snow is covered in a single wave when there is an overlap. When two waves overlap on kinder slopes, the design is much more dependable; however, the overall cost of the coating during installation goes up, which is particularly apparent when the wave’s step is wider. The lower sheet overlaps the upper sheet by at least 200 mm.

Starting at the angle of the lower slope and continuing all the way along the cornice is required by the installation technology. When laying slate, you must consider the wind rise and ensure that the overlap occurs on the leeward side of the sheet. It is necessary to place the first row of sheets on a specially-stretched rope beforehand to ensure a smooth and even overhang. Use various styles and layers of slate to prevent combining them all at once. Commoner techniques are thought to be installed both with and without a displacement.

The displacement installation’s ease of use is its main draw. The next row is laid in this instance with a displacement from the previous row. This technique makes it possible to prevent specific wave coincidences and ensures that there are never more than two slate sheets at any given location.

When installing with a displacement, the top edge of the extreme row on the roof’s slope is trimmed and the extreme slate sheets are cut.

Installing the eight-wave slate is best done with a displacement lay. To begin each odd row using this method, simply create a four-wave offset and apply half of a cut slate sheet. Additionally, every displacement line in this styling version will be precisely and exquisitely placed in a checkerboard pattern.

When beginning installation and installation with your own hands, keep in mind that installing slate without displacement will save roofing material, but it will take more time. In this instance, you will have to trim the corners to be one wave width and 140 mm tall. The lower corner of each slave sheet in the upper row must be cut off from the side in order to place the coating components from left to right. These pieces will cover the previous sheet in the horizontal row.

Schifer lying in a dislocated manner

The fastener selection and installation technique have a direct bearing on the slate roof. The mounting of schifer nails, self-tapping screws, and other screws is done with a specific rubber gasket that ensures the mounting site is sufficiently tight. These screws are distinguished by their wider hats. It is crucial to keep in mind that fasteners are not tightened or driven until they come to a stop.

Only place slate on the roof at the wave’s crest. The lower portion of the overlapped wave with a distinct indent from the edge is the first portion of the mount. The second mounting point is diagonal from the first, and it is fastened at the top in the second wave after the roof’s slate covering is installed.

Following your manual coating installation, you will need to mount all adjacent joints and sections, lay special skating parts made of asbest cement, and provide dependable, premium waterproofing.

If you wish to paint the slate, you must first clean it and apply silicone primer to it. Then you can start covering it; we suggest using waterproof paint with an acrylic or silicone base for this purpose.

Guidelines for safety when handling slate sheets

It’s important to follow safety protocols in addition to installation techniques when performing roof work. Use of safety cables and specialty ropes is required. You must install the proper fence if the house is taller than six meters. You must use the block system and a unique kapron cable to carefully raise the slate sheets. Assistants serve the material with low construction.

Walking on the applied coating requires extreme caution. To ensure a more even distribution of load during slate roof repairs or maintenance, you must install wooden ramps that allow you to move freely along the roof.

Adherence to all safety protocols necessitates the utilization of protective gear when handling asbestos-cement construction materials: wear a respirator to shield your respiratory system from dangerous slate dust while drilling or cutting sheets.

How can you personally apply slate roofing material to a private residence? Acquiring the knowledge of properly covering the roof, which involves painting and following detailed instructions accompanied by photos and videos

Laying slate on the roof – cut correctly with your own hands

Preliminary planning is necessary for the slate roof device, just like for any construction process. Since all subsequent calculations rely on the form of the future coating, it is important to first determine its shape. The roof composed of sheet materials can be gable unchilding (with a slope of 1-2%), flat (single-sloping with a slope of 1-2%), or single-sloping.

7%), and the attic, where the os (slope of the slope) is 40 percent or higher.

Selecting intermediate options is not advised because, for example, the maximum amount of snow accumulates on roofs with winter slopes between 20 and 35 degrees. Additionally, roofs with four slopes or intricate designs are occasionally chosen, but under the slate, they typically go with the most straightforward geometry.

Chifer selection

Domestic slate is typically used in construction, and GOST 30340-95 specifies the maximum and minimum dimensions for each type of sheet: six-wave sheets are 5, 5, or 7 mm thick and 1125 mm wide; seven- and eight-wave sheets are 5.8 mm thick and 980 and 1130 mm wide, respectively. Any type of sheet has a fixed length of 1750 mm.

By the brand, you can determine, in addition to the number of waves, the height of the wave (the distance between the bottom and the crest) and its step – the distance between the same points of neighboring waves. For example, brand 40/150-8 denotes an 8-wave slate with a wave height of 40 mm and a step of 150 mm. These parameters should not be underestimated when calculating. With the same width, when laying a frame (with the overlap of waves of vertical sheets) The consumption of the six -wave slate will be greater than that of the eight -wave – After all, he has a wider step of each wave, respectively, the area that will go to the overlap is also increasing.

The roofing installation sequence is also impacted by the sedimentary water collection system that was chosen. It is possible to create a drainage groove beneath the final row of slate, which will allow the sheets to protrude 200–250 mm behind the building’s facade. The protrusion should be between 400 and 500 mm if a direct water discharge from the roof to the nearby area is intended.

Preparation of the bearing roof structures

Rafters are arranged according to the selected roof structure and slope angle prior to laying slate on the roof. Next, a crate is stacked along the beams. Typically, when installing rafters, a 50×180 beard is chosen and the narrow side is positioned vertically.

Colelite, which is composed of uncut boards measuring 15–25 mm, or 60 x 60 timber, is placed perpendicular to the rafters. The space between the boards is measured at 200–1250 mm, and between the bars is such that every sheet depends on a minimum of three of them.

400–450 millimeters). It is imperative to appropriately construct a crate around any pipes that may be present on the roof (refer to the illustration).

The installation of the drainage gutter occurs prior to the sheet installation. To stop the edge of the sheets from fraying, a strip of metal 250–300 mm wide and 2-3 mm thick was placed beneath the latter’s sheets. The strip is coated with waterproof material on both sides. It is also essential to pre-drill holes in the metal where the slate fastening will eventually be placed. There is also the option to install a vapor barrier beneath the slate to enhance the functioning characteristics of the operated (attic) roof.

The procedure for laying slate on the roof

Horizontal sheets always cross over one another. There may be one or two waves that overlap. Although the second option is more costly, the roof strength is higher. A vertical overlap of no less than 200 mm is required. There are generally multiple approaches to laying out methods. There are various approaches to solving the problem of fixing more than two layers of slate at once, as doing so presents challenges.

The most widely used is "Route Laying." It causes the waves in each row to overlap at an uneven angle, making only two sheets possible at any given time. Each new row is laid with a shift in relation to the previous one. You must cut multiple waves from the extreme sheet in order to execute shifts. Nevertheless, this technique results in an uneven roof edge in the final vertical rows, which requires special trimming.

There is a more workable version of the same procedure for the eight-wave slate. Every single odd horizontal row sheet, up to the first one, is divided in half (4 waves). It will be distinctly repeated throughout the row as a result of the displacement line, which is both practical and visually beautiful. Furthermore, two rows can be started simultaneously with just the cut halves of the sheet. You can no longer manage the displacement after the first sheets are installed (including the halves); instead, you can just lay the sheets horizontally, allowing the shift to form naturally. Pruning might only be necessary for end edge alignment.

There is a labor-intensive method called "laying without displacement" that is more cost-effective in terms of material consumption. If the sheets are arranged in this manner, from left to right, the upper row’s corners will need to be cut by roughly 100 mm in width and 120–140 mm in length. The side that covers the preceding sheet of its horizontal row is where the lower corner is cut. As a result, all sheets overlap normally in both the horizontal and vertical directions (the figure illustrates this).

Nails, self-tapping screws, or special screws are used when laying slate on the roof. Every kind of fastener has a rubber gasket underneath its enlarged hat. It is highly advised that the sheets be marked with the crate’s steps ahead of time and have holes drilled for fasteners. This is usually the only option when it comes to screws and self-tapping screws, but incorrect nail clogging can split the sheet.

The holes are symmetrically positioned diagonally (through the upper overlapping sheet), in the lower corner of the sheet, and in the second overlapped wave. Additionally, the sixth (penultimate) wave is attached to the last sheet of the row horizontally. Every kind of fastener is put in place at the wave’s crest. The material will rapidly deteriorate if nails and screws are placed again. Retrench from the sheet’s transverse edge by 120–150 mm, depending on how much of the rows’ vertical overlap there is.

If shifting the slate becomes necessary, it is done so cautiously, avoiding strikes and applying excessive pressure. On top of the slate, at the appropriate locations, is a wooden stage with transverse stupid strips for the eventual cleaning of the roof and similar surfaces. A fence made of metal reinforcement is erected around the roof at a height of 6 meters. Use other devices and safety cables when working.

Special figured elements made of asbest cement are used for the installation of skates, roof joints, cornices, adjacent to pipes, etc. Their installation guarantees adequate dependability, particularly when it comes to bitumen mastic and concrete strengthening. I do use wooden boards and galvanizing stripes occasionally. These designs won’t last as long, though, and this is not very aesthetically pleasing. A correctly installed slate roof can last for at least 50 years before needing repair (apart from emergencies brought on by external exposure).

Slate roof installation requires careful preparation in advance, just like any other construction process. Slate must be cut to size by hand. To begin with, it is expensive.

Materials Needed Determine the type of roofing material suitable for your climate and budget.
Preparation Clean the roof surface thoroughly and repair any damaged areas.
Installation Begin laying the roofing material from the bottom edge, overlapping each row to ensure water resistance.
Finishing Secure edges and corners properly and apply any necessary sealant to ensure durability.

Using your hands to cover your roof can be a satisfying and economical project. By taking these precautions, you can make sure that your roof protects your house from the elements and looks great too.

First, make sure everything is ready. Examine the roof for any damage, then fix it as needed. Before you start, make sure the surface is clean and dry and remove any debris.

Select the appropriate materials for your project next. Take into account elements like toughness, resilience to the elements, and visual appeal. Make sure the tiles, metal sheets, or shingles you choose are appropriate for your climate and structural requirements.

Before laying materials, take precise measurements and make detailed plans. A well-thought-out plan and precise measurements will reduce waste and guarantee a more seamless installation process.

Pay close attention to the manufacturer’s instructions when installing anything. To safely handle materials and navigate your roof, wear the proper safety gear and tools. Take your time to ensure that every piece is securely fastened to avoid problems later.

Finally, after the work is finished, thoroughly inspect the area. Keep an eye out for any holes, loose parts, or places that might require more care. Maintaining your roof properly will increase its lifespan and keep your house safe for many years to come.

"Refinishing your roof on your own can be a satisfying and economical project that presents chances to improve your house as well as challenges. You can accomplish this task by paying attention to a few crucial steps and safety instructions. This guide will provide you with the necessary knowledge to create a long-lasting and attractive roof that fits your style and budget, from selecting the appropriate materials to comprehending fundamental techniques like measuring and laying."

Video on the topic

How to raise slate on the roof of the house alone. A very simple, but effective way. LCD self -hand

How to cover the roof yourself with slate

Schifer"s forgotten secret to laying. Grandfather method.

How to cut the corners of the slate

Speaker laying, without trimming corners/how to lay slate alone/new life

What do you think, which element is the most important for a reliable and durable roof?
Share to friends
Alexandra Fedorova

Journalist, author of articles on construction and repair. I will help you understand the complex issues related to the choice and installation of the roof.

Rate author
Innfes.com
Add a comment