How to put a metal tile on the roof

Are you considering adding metal roof tiles? Metal tiles are strong, aesthetically pleasing, and provide superior weather resistance. Installing a new roof covering or replacing an old one requires knowledge of the procedure, which is essential for a good result.

First things first, preparation is key. Make sure the decking on your roof is clear of debris and structurally sound. Before continuing, any necessary repairs should be finished. Sufficient insulation and underlayment are also necessary to improve energy efficiency and provide moisture protection.

The next step is to select the appropriate metal tiles. Take into account elements such as color, profile (shape and design), and material (copper, aluminum, or steel). Regarding longevity, upkeep needs, and visual appeal, each choice has unique advantages. Choose tiles that go well with the architectural style and climate of your house.

Measure and carefully plan the layout before installation. Ascend the roof from its lowest point, making sure that every tile fits snugly over the one before it. To ensure structural integrity and weather resistance, adhere to the manufacturer’s instructions regarding fastening techniques and spacing.

Give safety top priority when installing. To avoid mishaps, wear the proper safety equipment and adhere to recommended procedures. Collaborating in groups can enhance productivity and guarantee a seamless installation process.

Finally, regular upkeep will increase the longevity of your metal roof. Check frequently for wear or damage, particularly following inclement weather. Timely maintenance can avert more serious problems and maintain the aesthetic appeal and performance of your metal tile roof for many years to come.

List of tools for laying metal tiles

Operating at an elevation poses a risk, and being sidetracked by malfunctioning equipment is a highly undesirable outcome. You must inspect them technically, change the cutting elements, etc., before you begin work. D. Purchasing a specific carpenter belt is highly recommended by experts. It has numerous pockets and tools for mending hand tools and other items; these are always close at hand, preventing attention from being diverted by looking for them and wasting time.

The following equipment is needed for coating technology:

    Measuring. You must have a marker, a square, a long even rail or a rule, roulette. It is desirable that the roulette has a rag tape, the metal can damage the upper decorative layer of the tile. You should know that, in addition to decorative, painting also performs a protective anti -corrosion function, its damage greatly reduces the operation of the roof;

Tools for measuring

Equipment for bending and cutting metal sheets

Screw-twisting instruments

Vital. Acquiring a spray can containing the same paint at the same time as the metal tiles is highly advised. Painting over areas of the cut, surface scratches on the sheets, and other small mechanical damage to the roof are all necessary.

Prices for metal tiles

Metal attic

We’ll take you step-by-step through the installation of metal tiles on your roof in this guide. Everything you need to know will be covered, from leveling and installing underlayment to positioning and fastening the metal tiles. Knowing these procedures and pointers will help guarantee a long-lasting and aesthetically pleasing metal tile roof for your house, regardless of whether you’re thinking about doing it yourself or hiring an expert." Please let me know if you require any changes or additional information!

Preparatory events

To avoid unanticipated events during the work, ensure that the process proceeds smoothly, and maintain the quality of the roof, every action you take must be carefully considered and broken down into manageable steps.

The first stage – delivery of materials

The sizes of the roof slopes must be measured, the number and length of apples and skates must be determined, and a drainage circuit must be drawn. The optimal quantity of each element will be determined by the store staff using a customized program based on these data. It is not required to order the material right away; you can perform these calculations in a number of trading firms and select the best option for you based on the information at hand. You should promptly agree on the roof’s delivery, with the car body’s length equal to or greater than the length of the metal tile sheets.

The length of the order and the car’s length must match.

The machine’s load capacity needs to match the shipped orders.

Sensible guidance. You can beat long boards to a short body even if such a car is pricey or hard to find. Such cars can be used to transport the roof over short distances.

Select a platform for material storage right away, level the surface, and create a temporary canopy if needed.

The second stage is the manufacture of devices

It is essential to have a minimum of three devices as they greatly expedite the installation process of metal tiles and improve worker safety.

Movable stairwell with brakes

Ceiling

Serving metal tiles

You must wear shoes with a soft, non-slip sole for working, and your clothing should be loose-fitting, free of hanging details, and not restrict your movements.

You have to wear appropriate footwear and clothing for work.

The third stage – checking the size of the rafter system

It’s still possible to solve the rafter system’s issues. First, confirm that the gable roof’s slopes are rectangular. It’s easy to do: measure two diagonals and assume that everything is normal if they are the same. Should a distinction be observed, the marriage must be terminated. Triangular slopes should resemble isosceles triangles; locate the vertex and ensure that its projection is precisely in the center.

Verifying the slopes’ geometry

Measurements of the space between the crate’s rails must also be taken at the same time. The type of metal tile determines these parameters.

The pitch of the crate scheme

The first one from the crate board’s cornice

The centers of the boards should be spaced equally apart.

Step of the metal tile maxi-crate

The suggested procedure for the crate containing the Monteria and Supermontires metal tiles

It is advised to treat the wooden components of the rafter system with antiseptics.

Fourth stage – roofing

Only with careful preparation should you approach them. We have to check the weather and select days that will be sunny. This is particularly crucial if you intend to build a heated roof. Mineral wool absorbs moisture quickly and takes a very long time to dry. If the heater was already installed between the rafters when the issue occurred, it will need to be taken out. This can harm the insulation mechanically in addition to being prolonged.

It is best to complete roofing, especially insulation, on a nice day.

Calculator. Roof slope thickness thickness

Metal tile installation needs to take the roof’s structure into consideration. Manufacturer recommendations as well as building codes and regulations must be followed to the letter.

The fifth stage – installation of the spillway system

Before roofing work begins, a few spillway system components should be installed. A particular list is determined by the system’s design elements and the technology chosen for roof installation.

Checking the work’s performance is necessary after it is finished. To accomplish this, fill a bucket with water, pour it onto the roof, and then measure the amount that spilled out of the drain pipe on each side of the house.

Verifying the drainage system’s operational capability

It ought to be 9.5 liters or more. Should it be smaller, this suggests two issues:

    The wrong distance between the gutter and the edge of the roof, the water from the slope flows past the gutters. A very unpleasant situation, you will have to completely redo the fixation hooks and change the position of the element of the system;

The gutter’s edge ought to be 25–30 mm below the metal tile’s edge.

Fixing the drainage gutter in place

Plan for installing the drainage system’s hooks

Prices for drains

Drains

Practical tips: how to put a metal tile on the roof

One by one, the sheets rise to the roof, and they are fixed with unique self-tapping screws that have rubber gaskets.

The first sheet is positioned parallel to the roof’s end.

Since the metizes are acquired concurrently with the roof, the color of the screw heads should match the color of the metal tile. It is about 30 mm long and 4.8 mm wide. At least eight self-tapping screws are screwed in a checkerboard pattern per square meter.

Self-tapping screws are used to secure the sheets in the upper overlap area.

The sheets’ edges are positioned in relation to the bar’s cornice.

Self-tapping screws are fastened in a checkerboard pattern through a single wave.

There is a 50 mm overhang over the cornice, and the installation process is dictated by where the drainage grooves are placed. The areas where the sheets have been cut and mechanically damaged are painted to match the facial surface’s tone.

Installation of the ridge element

The skate element is carried out by multiple processes:

  • Decorative. Improves the appearance of the roof, gives it a complete look;
  • technical. Does not allow moisture and snow entering the attic, protects wooden structures of the roofing system from getting wet and rotting. Another technical function is to ensure optimal natural ventilation indicators.

Either a flat or semicircular skate element is possible. Although the first is more complicated, it has better technical qualities. The skate components are attached to the metal tile waves’ crests; there is a roughly 10-cm overlap. Seals cover the fractures to keep birds and insects out of the undercarbon space, but they don’t stop airflow.

The purpose of the seals is to stop shadow

Prices for various types of roofing skates

Roofing horse

Installation of a cornice bar

This part of the roof serves a practical purpose in addition to being ornamental. keeps a crate and the legs of a rafter dry, allows airflow to the underbuilding, and enhances the roof’s aesthetics. It is installed with a 10-cm overlap and secured with self-tapping screws at a 25–30 cm step.

The gutter’s edge and the cornice bar’s lower edge must overlap.

Installation of yendov

The crate, a complicated component of the roof, ought to be continuous in these areas. Two yendovs—an internal and an external one—are mounted on the roof in accordance with current technology. The interior is installed on a continuous crate beneath a metal tile. collects and routes wastewater from roof slopes into the drainage system. External endova is attached to the roof sheets and is only used for decoration.

The lower yendova’s attachment scheme in the adjacent zone

The upper yendov bar is attached, and metal tile sheets are placed on the lower yendy bar.

Fastening of the end bar

The end bar closes the uneven cut in the metal, shields the wind boards from moisture, and keeps the sheets from separating in a strong wind. The distance between self-tapping screws is 50–60 cm, with the fastening proceeding from the bottom up. The wind bar’s horizontal plane is fastened to the metal tile’s waves with screws.

The ends are secured after the 500–600 mm.

Screws that self-tap to secure a cornice bar

The strips’ intersection

Installation of snow holders

There are several types of them, the technology for installing each differs. The most durable those designs whose stubborn elements are attached to the crate. If the screws are screwed only into the waves of metal tiles, then such snow retainers are rather decorative than a functional character. Professional roofers strongly do not recommend installing them, there are almost no practical benefits, but there are risks of very unpleasant damage to the roof. Snow holders in the form of strips can hold small volumes of snow, its fall will not damage the spillway system. And a large amount of snow will tear out snow retainers from the attachment sites. As a result – large damage to metal roofing sheets.

Securely fastening the supporter

The distance between the cornice and the snow retainer

Snow retention device on a private home’s roof

Snow holders prices

Snow holder

Step -by -step instructions for installing metal tiles

Think about the most basic gable roof, for instance. You should install a few extra components before you begin installing a metal tile.

    Cades. Screwed with self -tapping screws to the cornice, protect them from moisture and improve the appearance of the roof.

Dropper for condensation output

The net closes off the venti-zeal space.

Yendova installation

Installed gutter drainage hooks

Sensible guidance. Installing wind protection is not necessary if the roof is cold. However, knowledgeable roofers advise her regardless.

Why? The owners’ plans may change over time, in which case the attic space beneath the living area will need to be renovated and given a warm roof. Wind protection is not completed if the vapor defense system and insulation can be installed from the inside of the attic. Furthermore, without it, the only heater that can be used is foam, which isn’t ideal for everyone.

Although it is optional, it is advised to begin roof construction on the leeward side of the slope. Take note of where the locks are located. Sometimes the subsequent sheets cover them, and other times a new sheet needs to be adhered underneath the previously installed one. This has an impact on the screw-tightening order.

The first step is to raise the sheet to the roof. Verify its position with respect to the cornice line. The sheet overhangs by at least five centimeters; the precise amount depends on the spillway system’s specifications. Replace the first sheet with a self-tapping screw instead of fixing it.

Fastening of a metal sheet

Step 2: Raise the second metal tile sheet, attach it to the first lock, and then double-check where the lower edge is.

Attaching the ensuing sheets

When correcting the entire stained roof, it can be very challenging to align the cornice line on one sheet. The error can show up on a sheet or four or five. More assurances that there won’t be any deviations in the future are provided by two sheets. Using self-tapping screws, fasten both sheets in the suggested order.

How to lay sheets

As near as possible, the metiza should be screwed into the profile protrusion; in this location, the second horizontal row should rest on a wooden crate. The sheet will distort when the self-tapping screw is inserted, greatly worsening the roof’s appearance the farther away from the protrusion and the greater the distance between the metal and the crate.

Screws that self-tap should be positioned precisely perpendicular.

Self-destructive plan

This procedure should be followed to cover one roof slope, paying attention to the sheet fixing order. When work is done, proceed to the second slope and arrange two rows of sheets. It is now necessary to mount the skating element and finish the roof at the same time. This technology is better because there is less chance that the thin metal roof elements will deform.

Sheet installation on the second slope

Arranging the final set of sheets

Installation of ridge elements

In order to stop snow from blowing under the horse during the winter, you must fix the seal before repairing the skate. The sealant is shaped like a strip and measures approximately 2 by 2 cm. Its composition is self-adhesive on the one hand. The protective film must be taken off the strip, the skate element must be turned to face the back, the area must be cleared of dust, and the seal must be glued. Self-tapping screws are used to fasten the skates to the metal tile crests. Take great care to ensure that the adjacent lines are parallel; do not pull the screws or press against the ridge element.

The technology used to install the seal and skate bar

Skates are fastened to the metal tile’s crests using screws.

Now you have to fix one horse and two sheets of metal tile in turn. In this manner, you must keep working until the second slope’s roof is installed and the ridge elements are fully installed.

End (wind) planks

They are screwed to wind boards or other crate components at a distance of roughly 50 cm. The work is done from the bottom up, with a 10-cm overlap.

The end bar is installed.

The end strips are put in, and this facility’s roof installation is finished.

Arrangement of adjustment zones (yends)

These are the most intricate and dangerous parts of the building roofs because there is a lot of water distributed along them from two slopes, increasing the likelihood of leaks developing. Since only a continuous crate is constructed in these areas, you can first lay any flexible waterproof material to increase tightness. Yenduvs, or junction zones, are created in two steps.

  1. Lowing the lower element of the yendova. It is made of the same metal as the tile, has the form of a bent sheet. The bending angle is adjusted during the installation of the element and depends on the parameters of the roof. Overlap within 10 cm, element width 15–20 cm. Fixation can be performed by self -tapping screws at the distance from the place of bending no ten centimeters or special metal stripes. The second method does not make holes in the valleys and is considered more reliable. Although in practice there is no difference, if everything is done according to the instructions, then both methods of attaching the lower element of the adjoining zone guarantee the complete tightness of the roof.
    The lower element is mounted before the installation of metal tiles, this is a general rule for all types of roofs. After the entire slot is closed, you can proceed to the second stage.
  2. Laying the upper element of the yendova. This is a decorative element, mounted at the finish stage of the roof installation. Screwed with self -tapping screws to the ledges of tiles.

Upper and lower endova

Vital. Prior to installation, the protective film needs to be taken off of all metal roof components. There’s no need to leave it in the hopes that this will extend the roof’s operational duration. The film cracks when exposed to sunlight and high temperatures, allowing dirt and water to seep into the crevices and deteriorating the roof’s appearance. There is nothing that can be done because the protective film cannot be removed from the surface after a few months.

Specialized ramps, consisting of wooden bars fixed to the skate, should be used when moving along the roof that has already been installed. The ladders are moved to a new location if needed.

1. Prepare the Roof: Clean the surface and ensure it"s smooth and dry.
2. Measure and Plan: Measure the roof area accurately. Plan the layout to minimize cutting.
3. Install Underlayment: Apply a suitable underlayment to protect against moisture.
4. Start with Starter Strips: Begin at the eaves with starter strips to provide a secure base.
5. Lay the Metal Tiles: Overlap tiles according to the manufacturer"s instructions, starting from the bottom to the top.
6. Secure and Seal: Fasten tiles securely using screws or clips. Seal joints and edges to prevent leaks.

You can increase your roof’s resilience and visual appeal by installing metal tiles. Because of their durability and ability to withstand a range of weather conditions, metal tiles are a popular option for homeowners. In order to guarantee a successful installation, there are a few essential steps to follow when installing a new roof or replacing an old one.

First things first, preparation is key. Make sure the roof structure can sustain the weight of the metal tiles by first examining it. Prior to continuing, take care of any underlying problems, such as rot or damage. Thoroughly clean the roof’s surface to get rid of any dirt, debris, or outdated roofing materials. This helps to avoid further issues and guarantees a smooth surface for the metal tiles to be laid down.

Think about the installation technique next. Direct fastening systems or interlocking panels can usually be used to install metal tiles. A seamless appearance and improved weather resistance are offered by interlocking panels, whereas direct fastening requires securing each tile separately. Select the approach that best fits your needs and the style of your roof.

Start at one edge of the roof and work your way across in rows to install the metal tiles. Refer to the manufacturer’s instructions regarding overlap and fastening specifications. To guarantee a tight fit, use the proper fasteners made for metal roofing. Maintaining a consistent look and appropriate drainage requires careful attention to the alignment and spacing of the tiles.

Once the installation is complete, check the entire roof to make sure everything is correctly aligned and securely fastened. To stop leaks and improve the weather resistance of the roof, seal any exposed fasteners or seams in accordance with the manufacturer’s instructions. Your metal tile roof will last longer if you do routine maintenance, like clearing debris and looking for damage.

Video on the topic

Installation of metal tiles together with the customer.

The guy mounts a metal tile and completes the construction of a single -sided roof

Errors in the installation of metal tiles.

The correct installation of the roof. Stroy and live

Installation of Wackman metal tiles. Sand. Day 15.

What do you think, which element is the most important for a reliable and durable roof?
Share to friends
Alexandra Fedorova

Journalist, author of articles on construction and repair. I will help you understand the complex issues related to the choice and installation of the roof.

Rate author
Innfes.com
Add a comment