A soft tile roof is a useful option for residential roofing needs because of its long lifespan and attractive appearance. These tiles, which are made of fiberglass or asphalt, have the appearance of traditional clay or slate tiles but are more flexible and simpler to install.
A soft tile roof requires several critical steps to ensure longevity and functionality during calculation and installation. Every step is essential to completing a roofing system correctly, from measuring the roof to choosing the appropriate materials.
We’ll go into great detail about how to calculate the materials required for your soft tile roof throughout this guide, along with offering a thorough, step-by-step rundown of the installation procedure. Knowing these basics will enable you to make well-informed decisions regarding your roofing investment, regardless of whether you’re thinking about doing it yourself or hiring professionals.
Soft Tile Roof Calculations | Step-by-Step Installation Overview |
To determine material needs, measure roof dimensions, accounting for slope and overhang. Calculate coverage area including waste. | Begin with underlayment, ensuring even coverage. Lay tiles from bottom to top, aligning each row carefully. Cut tiles as needed for edges and fixtures. Secure with nails or adhesive as per manufacturer"s instructions. Finish with ridge caps for a sealed roof. |
- Stage I. Studying the structure of the roof of soft tiles
- Stage II. Calculation of the necessary materials
- Stage III. Roofing slopes for laying
- Stage IV. The device of the rafter system and the base
- Stage V. Ensuring the waterproofing layer
- Stage VI. Installation of additional elements
- Stage VII. Laying the first rows of tiles on the markings
- Stage VIII. Circle of engineering pipes
- Video on the topic
- We carry out work on laying a soft roof. Key points of installation of soft tiles
- Four -sided roof of the gazebo -2 part. Installation of USB sheets, installation of bitumen tiles or soft roof
- Roof 6×6 SNT Khvoyny 1.2 – installation of flexible tiles on a hip roof
- Overview of the construction of the gazebo. Laying soft tiles
- Errors when installing a soft roof
Stage I. Studying the structure of the roof of soft tiles
For many years, flexible bitumen tiles have been widely used due to their affordability, ease of installation, and long lifespan. Furthermore, this installation determines the overall roof’s dependability and durability. There is, however, a significant benefit: the tiles are flexible and can be used on roofs of any complexity.
Prior to anything else, carefully consider and research the components that make up your roof. It’s true that you’ll need aprons, Endov, piece hounds, and a lot more for her:
Check out what the entire procedure will entail:
Basically, the price and quantity of roofing materials used, along with the manufacturer, models, and even the design, determine the overall cost and design of the structure.
Regretfully, human error can lead to calculations going wrong even in expert projects. It can be challenging to accurately depict geometric dimensions on paper, particularly for small components like ends or yends, and to precisely state the slope of a slope based on other factors like height. Furthermore, a private home is frequently constructed without a precise project.
Thus, in the event that you have already constructed the house and are in the process of covering the roof, compare the two projects to see if they match up and contain no errors. It will surprise you!
The truth is that every centimeter that is wrongly counted on the A4 sheet on your roof will actually become a meter, which is already problematic. As a result, it is preferable to order measurements from experts or to measure every parameter directly at the construction site in order to avoid being lazy.
This is a fantastic example of how to install soft tiles in a practical way:
Stage II. Calculation of the necessary materials
We will now impart to you a straightforward and dependable technique for figuring out the roof racers. Furthermore, we recommend that you count everything yourself, regardless of the expert measurers you hire.
You will need to purchase it if the material is literally a few meters in length, and in the case of a bitumen tile, there is a sizable submerged stone. It is not easy to pick up the same coloring as previously laid races, as new races may have different colors.
When two identical pairs of shoes fit into different rooms, they don’t differ in color. However, when shoes rub against each other and have small differences in color, it can cause problems for the shoemaker. And everything is visible on the roof, regardless of how many shades separate men and women in this instance.
What can I say, even if there are sheets of different colors in one pack, what can I say? Moreover, the sheets were obtained from different packs at different times. As a result, proceed cautiously, especially since the roof will eventually require repairs. Everyone must deal with this, and you can feel at ease knowing that the garage has a pre-made repair complex.
You’ll require roughly this much material:
When purchasing finished tile, it is usually packaged in 22 gunts, which is sufficient for a roof area of only 3 square meters. If weight calculations are necessary, one square meter of single-layer tile typically weighs between 5 and 8 kg (or 20 kg in multi-layer tiles).
Simplicity in the roof construction process is also unfavorable, as there could be issues with workers who are impatient or precipitation at this time. Ultimately, it’s possible that the required material isn’t in the warehouse or that the business won’t sell such a small quantity of the chosen collection.
However, since tiles are still an expense, there is no sense in purchasing an excessive amount of them. When it comes time to replace the roof, it frequently turns out that the house’s estimate was lowered and there aren’t enough money. Rebuild and handle this matter sensibly as a result.
You already have enough ordinary line, transporter, and basic geometry knowledge to measure everything calmly and precisely. All that will be required is an accurate computation of the slopes’ area and consideration of certain points.
The most important thing is to make every effort to reduce everything to a minimum. In other words, it’s better to use more hounds and less circumcision. While additional material costs are inevitable, it is preferable to keep them to a minimum.
By the way, it’s precisely because of this that the estimate for building the roof frequently appears more affordable than it actually is—after all, it’s made entirely of leftover and unused materials.
Another crucial point is that, because of the ceiling, the actual tile area will be slightly larger than the coating’s clean area. As a result, add an additional 3-4% to the closing of the total quantity you completed.
Now, using geometric shapes, find the area of the slopes. In the event that the slopes are clearly rectangular in shape, multiply the length by the width. If the slopes are complex, multiply the result by the area of the figure that is visible on the sheet. However, if the slopes are not rectangular, multiply the result by 1.414 or 1.221, respectively, if the angle of inclination is 45 ° or a traditional 35 °.
Put your roof’s dimensions on paper and multiply them by a coefficient of 0.02. To make your painted house visible, translate each real meter to equal one centimeter on paper and multiply the result by two.
You can handle the area of a more complicated roof with the aid of this video lesson:
In summary, if you break down the roof’s calculation into distinct geometric elements rather than grabbing the entire computation at once, you will act appropriately. Simply determine each one’s area and determine how much bitumen should be packaged especially for them. Simply summarize the quantity of packages after that.
Compared to adding up the area of each component of the roof and then figuring out how many hounds to use, this approach is far more accurate. Why? Let’s go into further detail now.
It all comes down to the trick. You might figure out how much soft tile is needed for a triangle slope, for instance. You also recognize that the races are not specifically sold under your roof; rather, they are sold in standard size. Thus, they are unable to lie down in that manner and can only return perfectly, leaving no trace. Consequently, waste will occur, requiring you to buy a few extra sheets in the end.
However, you will obtain the incorrect quantity of material if you calculate the total number of packs that will be required for this section of the roof. In actuality, adding up the areas of all the stingrays results in a single, solid figure, similar to how two triangles add up to a rectangle.
However, in actuality, the races are insufficient because you overlooked the fact that the remnants of these triangles at the sheet’s edge will not fall naturally to other slopes; instead, they must simply be cut off.
Lastly, the manufacturers themselves recommend multiplying them by a unique coefficient that varies based on Gont’s shape. For instance, the traditional value for Tegola’s soft bitumen tiles is 0.25.
In order to account for technological errors or minor computation errors in your work, you should also add 10% to the total.
If bitumen mastic is required during installation. Do the following calculation: 5 liters for every 60 square meters of roof. Pneumatic pistolity is preferable to roofing nails, so stock up ahead of time. You will typically require 4 pieces per sheet, or 0.5 kg per 10 square meters of roof.
If you trust him, you can try using an online calculator to figure out how much your roof will cost. However, we still advise you to handle this task independently and to double-check your calculations using various calculators.
Typically, these calculators require you to combine the roof’s shape, surface area, side lengths, and, occasionally, the business and design. Visit the manufacturer’s website if you are certain about which manufacturer you will use for your tiles. They have an online calculator that can calculate your roof more precisely than analog ones.
Stage III. Roofing slopes for laying
First, measuring the area of the roof slope, reducing it to a n-e number of times, and then transferring its layout to paper is very convenient.
Next, divide into an equal number of lanes (by sampling), and use this information to ascertain which manufacturer’s gont size is the most popular on the website:
As you can see, the same scheme will serve as your go-to reference for identifying slopes that have already been laid.
Stage IV. The device of the rafter system and the base
Thus, flexible roof tiles fit onto a fixed base. Underneath it, a lining carpet is preferable since it will serve as both a thermal and a waterproof barrier.
When installing soft tiles, there must only be a level, dry base free of any imperfections or waves that will be obvious:
However, it’s not hard to figure out how much plywood you need—you just need to factor in the supply of 3–4%. Under the soft roof, that is what the base ought to be:
Stage V. Ensuring the waterproofing layer
When installing soft tiles, you should pay close attention to the roof’s weak spots, which are the areas where rainwater exerts pressure and frequently develops leaks or damaged mounted rains:
- The first to open to the sky – Ovka. This is a horizontal rib where you intersect and roofing racks.
- Pediments, Namely, the lateral part of the roofing slopes, which are subjected to serious wind loads, where you will fasten the end wind planes to protect the subcutaneous space from moisture.
- Groove, Space or Endov is an inner angle, which is also formed by two slopes of the roof, but already below. The most vulnerable in terms of leaks, because all the water flows here from the roof. That is why, regardless of the design of the roof, additional waterproofing is necessarily laid.
- Cornice – the lowest part of the roof that protects the surface of the wall from rainwater and where you install the cornice bar.
Thus, tend to a dependable and secure base before laying:
The lining carpet is now laid by the droppers, which are now mounted on the ready-made base. It is typically made of bitumen and acts as an extra layer of waterproofing that is not unnecessary.
It must be mounted horizontally with an overhang of 10 to 15 centimeters, from below to up:
Perhaps you were wondering, given that the bitumen tile itself is hydronomable, why is the lining carpet?
The material on racetracks isn’t entirely continuous, so there’s always a chance of submerging yourself in the water (especially in trouble spots). And this is frequently aided by the wind!
Stage VI. Installation of additional elements
Let’s proceed to installing the remaining components now. When installing a soft tile roof, the arrangement is nearly identical to that of metal roofs, with very minor variations.
For flexible tiles, all of these extra components typically have a length of two meters. The entire length of the roof, where the metal strips must be installed, must be determined and divided by 1.9 meters to determine the required quantity of strips.
Take into account the bars’ overlap to determine each bar’s useful length. Which one? There may be differences between manufacturers; you should consult the product’s technical guide.
When dealing with a soft tile roof, you will encounter ideas like ridge ventilation among others. If you’d like, you can outfit such a roof entirely, for as by adding a plastic or aluminum ventilation PVC to it.
Additionally, if you’re concerned that the rough roof surface won’t be able to handle the quantity of snowfall in your area, you can install snow retainers.
The ones that are most practical are snowmobiles. Arrange them on the roof in a checkerboard pattern. They resemble tiny hooks and are invisible on the roof; they should only be installed in order to initiate some of the components beneath the sheet during tile installation.
This guide covers every aspect of installing a soft tile roof, from preliminary calculations to final installation, in an easy-to-follow manner. This article aims to simplify the process, so that you understand every important step involved in achieving a long-lasting and aesthetically pleasing soft tile roof, whether you’re thinking about getting a new roof or taking on a do-it-yourself project."
Stage VII. Laying the first rows of tiles on the markings
You’ll find it useful to mark lines as you lay. These serve as guidelines for both horizontal and vertical hit alignment. Applying them with a little lace or chalking is not difficult:
They will be especially helpful if a roof component collides with a slope or if the roof’s geometry is unusual in general.
The horizontal lines are applied every 5 rows, or roughly 80 centimeters, and the step of the vertical lines must match the width of the regular tiles. But keep in mind that these are just suggestions, not strict guidelines:
The first thing to do when installing soft tiles is to make all the necessary calculations. Measure and adjust each counterparty’s height difference using the lace. Comparing the surface in a single plane is crucial.
The first row of tiles is fixed to the bitumen mastic (you can use a special bit of "techno-nickel," which is made specifically for this kind of work, for a more dependable waterproofing):
Stage VIII. Circle of engineering pipes
It is crucial to construct the pipes bypass skillfully, requiring bitumen mastic and a specific apron:
Careful planning and exact execution are necessary when installing a soft tile roof. Every stage, from the preliminary calculations to the last installation, is essential to guaranteeing a long-lasting and useful roof. Accurately estimating quantities and comprehending the necessary materials are crucial to preventing delays and extra expenses.
Paying close attention to details is essential when installing something. Whether it’s wood decking or another substrate, properly preparing the roof surface guarantees a strong base for the soft tiles. To preserve integrity and weather resistance, each tile must be carefully installed in accordance with manufacturer instructions.
The weather is a major factor during installation as well. Achieving ideal results requires selecting days with the right weather and knowing how humidity and temperature can impact the installation process. Incorporating appropriate drainage and ventilation systems also extends the life of the roof by preventing moisture buildup and potential damage.
In the end, a properly installed soft tile roof improves a building’s visual appeal while offering dependable weather protection. It gives homeowners peace of mind and is a significant investment in the longevity and value of a property. Installing a soft tile roof can be a rewarding project that improves both function and beauty if it is planned carefully, carried out meticulously, and adheres to best practices.